Skip to main content

Rivian’s first solar-powered EV charger in Tennessee is now live

Rivian and solar company Clearloop have debuted the first of Rivian’s solar-powered EV chargers in Tennessee.

Rivian’s solar-powered EV charger

Rivian’s first Waypoints EV charger is in Paris, Tennessee, a city with a population of around 10,000 that’s two hours northwest of Nashville.

Rivian’s new Waypoints at Eiffel Tower Park in Paris, at 1020 Maurice Fields Drive, has a J1772 plug. And bonus: It’s right next to a 70-foot replica of the Eiffel Tower that drivers can admire while they’re charging.

Rivian and Clearloop’s 1 megawatt (MW) Paris Solar Farm-Puryear project is powering the Level 2 EV charger. The two companies deliberately “aim to put renewables on more fossil-fueled grids where they can displace more coal and natural gas.”

Rivian provided upfront financing for the 1 MW solar farm, which is part of a larger 6.75 MW project that will cover electricity used by Rivian Waypoints chargers in Tennessee state parks and other clean energy projects in the region.

Rivian’s Waypoints EV chargers are currently located in 12 Tennessee state parks:

  • Radnor Lake
  • Cumberland Mountain
  • South Cumberland
  • Montgomery Bell
  • Cove Lake
  • Indian Mountain
  • Meeman-Shelby Forest
  • Natchez Trace
  • Warrior’s Path
  • Fall Creek Falls
  • Pickwick Landing
  • Seven Islands State Birding Park

As of December 2022, Rivian’s 1 MW portion of the Paris Solar Farm-Puryear is expected to annually generate more renewable energy than all the state park sites’ needs.

Electrek’s Take

According to Nashville-based Clearloop, Tennessee’s grid is powered by only 0.4% solar. The Solar Energy Industries Association (SEIA) says that as of third quarter 2022, Tennessee had 609 MW of solar installed and that the percentage of Tennessee’s electricity from solar is 0.9%.

Tennessee’s national solar ranking is 31st among the 50 states.

Either way, Tennessee doesn’t even break 1% when it comes to solar, so the Volunteer State has a lot of scope for improvement. And sadly, it’s going in the wrong direction: the SEIA projects that Tennessee will fall from 31st to 35th over the next five years, with only 1,286 MW growth projection.

The Tennessee Valley Authority, which covers all of Tennessee and is federally owned, did decide to develop a statewide network of EV fast chargers in February 2021, so that’s a great thing. But TVA only has 14 solar sites and no wind. It needs to do better.

Photo: WBBJ


UnderstandSolar is a free service that links you to top-rated solar installers in your region for personalized solar estimates. Tesla now offers price matching, so it’s important to shop for the best quotes. Click here to learn more and get your quotes. — *ad

FTC: We use income earning auto affiliate links. More.

Stay up to date with the latest content by subscribing to Electrek on Google News. You’re reading Electrek— experts who break news about Tesla, electric vehicles, and green energy, day after day. Be sure to check out our homepage for all the latest news, and follow Electrek on Twitter, Facebook, and LinkedIn to stay in the loop. Don’t know where to start? Check out our YouTube channel for the latest reviews.

Comments

Author

Avatar for Michelle Lewis Michelle Lewis

Michelle Lewis is a writer and editor on Electrek and an editor on DroneDJ, 9to5Mac, and 9to5Google. She lives in White River Junction, Vermont. She has previously worked for Fast Company, the Guardian, News Deeply, Time, and others. Message Michelle on Twitter or at michelle@9to5mac.com. Check out her personal blog.


Manage push notifications

notification icon
We would like to show you notifications for the latest news and updates.
notification icon
You are subscribed to notifications
notification icon
We would like to show you notifications for the latest news and updates.
notification icon
You are subscribed to notifications