Skip to main content

The US just beat its goal to permit 25 GW of clean energy by 2025

The US Department of the Interior has now permitted more than 25 gigawatts (GW) of clean energy projects – surpassing its original 25 GW by 2025 goal.

25 GW of clean energy permits by 2024

Once the federally permitted 25 GW comes online, it will be enough clean energy to power more than 12 million homes across the US. 

The clean energy projects include solar, wind, and geothermal, as well as generation interconnect (gen-tie) lines on public lands to connect the projects on federal and non-federal land to the grid.

The Department of the Interior has now permitted nearly 29 GW of clean energy – enough to power more than 12 million homes across the US. Additionally, it’s also leased eight new areas in Solar Energy Zones with the capacity to generate nearly 2.5 GW of additional clean energy. 

As for what’s in the pipeline, the Bureau of Land Management (BLM) is currently processing permits for an additional 66 utility-scale clean energy projects proposed on public lands in the US West. Those projects could add more than 32 GW of renewable energy to the grid.

Around 200 applications for solar and wind, and more than 100 applications for solar and wind energy site area testing, are at the BLM’s preliminary review stage. All projects are tracked on this public online dashboard.

The BLM also announced today that two solar farms – the Arica and Victory Pass projects in California – are now online, adding 465 megawatts (MW) of clean electricity to the grid. That means more than 10 GW of clean energy is now generated on public lands, powering more than 5 million homes across the West. 

Electrek’s Take

Beating the permitting 25 GW of clean energy by 2025 goal is great news and something worth celebrating.

But all that permitted clean energy needs to come online, and that requires transmission capacity and grid upgrades. The Federal Energy Regulatory Commission (FERC) is working on a proposed rule to reform planning processes, and it finalized its interconnection rule to speed grid access in 2023.

However, the World Resources Institute reports, “Together, the 36 major transmission projects that could begin construction in the near-term represent only about 10% of the transmission investment needed in the US.” Power lines take a decade to build, but technology to increase capacity on existing lines is rolling out fast, so that could ease the backlog a bit.

Plus, FERC last year issued Order No. 2023, which requires transmission providers to, among other things, transition from a “first-come, first-served” to a “first-ready, first-served” cluster study process, and that will improve interconnection wait times.

Top comment by BF

Liked by 9 people

As alluded to In the article, transmission line construction, transformer construction, etc will make this a decades long process. But at least over the last several years, the half century of “renewables are just around the corner” is finally coming true

View all comments

Upgrading the national grid and bringing clean energy online is monumental. It’s going in the right direction, but the WRI declared the current rate of progress “insufficient,” and I have to agree. It’s time to use all our resources – and we have what we need – to bring this clean energy online much faster than our current pace.

Read more: The largest clean energy project in US history closes $11B, starts full construction


If you live in an area that has frequent natural disaster events, and are interested in making your home more resilient to power outages, consider going solar and adding a battery storage system. To make sure you find a trusted, reliable solar installer near you that offers competitive pricing, check out EnergySage, a free service that makes it easy for you to go solar. They have hundreds of pre-vetted solar installers competing for your business, ensuring you get high quality solutions and save 20-30% compared to going it alone. Plus, it’s free to use and you won’t get sales calls until you select an installer and share your phone number with them.

Your personalized solar quotes are easy to compare online and you’ll get access to unbiased Energy Advisers to help you every step of the way. Get started here. –ad*

FTC: We use income earning auto affiliate links. More.

Stay up to date with the latest content by subscribing to Electrek on Google News. You’re reading Electrek— experts who break news about Tesla, electric vehicles, and green energy, day after day. Be sure to check out our homepage for all the latest news, and follow Electrek on Twitter, Facebook, and LinkedIn to stay in the loop. Don’t know where to start? Check out our YouTube channel for the latest reviews.

Comments

Author

Avatar for Michelle Lewis Michelle Lewis

Michelle Lewis is a writer and editor on Electrek and an editor on DroneDJ, 9to5Mac, and 9to5Google. She lives in White River Junction, Vermont. She has previously worked for Fast Company, the Guardian, News Deeply, Time, and others. Message Michelle on Twitter or at michelle@9to5mac.com. Check out her personal blog.


Manage push notifications

notification icon
We would like to show you notifications for the latest news and updates.
notification icon
You are subscribed to notifications
notification icon
We would like to show you notifications for the latest news and updates.
notification icon
You are subscribed to notifications