Pennsylvania just opened its first federally funded EV charging station on the Pennsylvania Turnpike — a key step toward making long-distance EV travel easier across the state.
The new station just opened at the Blue Mountain Service Plaza at Exit 202 westbound. Another NEVI-funded site at the New Stanton Service Plaza (Exit 77 westbound) is expected to open next week, according to the Pennsylvania Department of Transportation (PennDOT).
The chargers were built using funds from the federal National Electric Vehicle Infrastructure (NEVI) program, which is designed to install fast, reliable charging stations where drivers already stop — especially along busy highway corridors.
The Pennsylvania Turnpike is one of the state’s most heavily traveled roads, particularly during holiday travel, making service plazas a natural location for en-route EV charging. This first Turnpike site marks the beginning of NEVI-funded charging directly on the state’s toll road.
The Blue Mountain and New Stanton locations are part of the Turnpike’s larger, systemwide EV charging rollout. Working with Applegreen Electric, the Turnpike plans to install 80 new universal EV charging stations across all 17 service plazas by the end of 2027.
In addition to the NEVI-funded sites, the Turnpike has already brought new chargers online at the North Somerset, South Somerset, and Hickory Run service plazas using funding from Pennsylvania’s Driving PA Forward program. Each location offers high-speed charging with four ports per site, and all chargers are designed to work with all EV models without the need for adapters.
The project was awarded under the first round of PennDOT’s NEVI Alternative Fuel Corridor program. The next phase of funding, known as Corridor Connections, is focused on filling in charging gaps along major roadways that fall outside previously designated alternative fuel corridors. The goal is to make longer EV trips across Pennsylvania easier and more predictable.
The announcement also comes as Pennsylvania continues to push back against federal attempts to block EV funding. The US Department of Transportation is currently withholding congressionally approved money that would have supported EV infrastructure projects and jobs in the state. Governor Josh Shapiro (D-PA) sued the Trump administration over the move and, alongside 15 other states, successfully challenged an earlier attempt to derail the NEVI program. That legal fight helped keep projects like these Turnpike charging stations moving forward across the Commonwealth.
Electrek’s Take
This is precisely what the Biden administration’s NEVI program was meant to do: put fast, reliable charging stations where drivers already stop. Service plazas on major turnpikes are prime real estate for EV charging, particularly during holiday and long-distance travel. Pennsylvania’s rollout is still early days, but once chargers are live at all 17 plazas – assuming the federal funding spigot stays open – one of the Northeast’s busiest corridors is going to be a great place to road-trip in an EV.
Read more: PA Turnpike to add 80 new Applegreen DC fast chargers by 2027

FTC: We use income earning auto affiliate links. More.
Comments