Gaelectric inks 1 MW deal to bring Tesla’s Powerpacks to Ireland
Ireland’s Gaelectric Group entered into an agreement with Tesla Motors to build a 1 MW demonstration utility-scale project. The project is expected to be deployed in 2016. The company is among the firsts to sign a “utility-scale” deal with Tesla. Executives from Gaelectric were among the electric utility industry specialists invited to the event introducing Tesla Energy at Tesla’s design studio in Los Angeles. Here’s Brendan McGrath, Gaelectric Group CEO, on the deal:
We are delighted to be associated with Tesla in introducing its battery systems to Ireland. As a renewable energy group with a pipeline of 500 MW of wind power in Ireland and energy storage projects in Ireland and Europe, Gaelectric has an obvious incentive to drive the adoption of technologies that facilitate the economic dispatch of wind and other renewable sources.