Skip to main content

The US’ largest clean energy infrastructure project is kicking off construction

SunZia, a massive wind power and transmission line project in the US Southwest, is now ready to start construction.

The project is made up of two arms: SunZia Wind and SunZia Transmission.

SunZia Wind is the largest wind project in the Western Hemisphere. The 3,500-megawatt (MW) wind farm sprawls across New Mexico’s counties of Torrance, Lincoln, and San Miguel.

SunZia Transmission is a 550-mile ± 525 kV high-voltage direct current (HVDC) transmission line between central New Mexico and south-central Arizona. It has the capacity to transport 3,000 MW of clean energy.

SunZia Transmission will enable SunZia Wind to supply customers in Arizona and California during early evening hours when demand is high but the available renewable energy supply is low. It’s going to use the same corridor as the Western Spirit Transmission Line:

The project’s California-based renewable energy developer Pattern Energy Group said today that it’s selected Hitachi Energy and Quanta Services as its engineering, procurement, and construction contractors to build the project.

Hitachi Energy, which has delivered more than half of the HVDC projects in North America, will supply the HVDC converter stations as well as its HVDC Light technology and MACH digital control platform for SunZia Transmission. Hitachi’s technology enables the efficient transfer and integration of huge volumes of renewable energy over long distances.

Infrastructure provider Quanta will provide a “turnkey solution” for the HVDC line, and Blattner Company, a Quanta operating company, will also provide “turnkey solutions” for SunZia Wind and its associated switchyard. That includes the installation of more than 900 turbines, 10 substations, multiple operations and maintenance facilities, and more than 100 miles of wind generation transmission lines.

Pattern says SunZia, which represents an investment of more than $5 billion, will “power the needs of more than 3 million Americans.” It is expected to create over 2,000 new jobs, has an expected economic impact of $20.5 billion, and is expected to come online in 2026.

Read more: This device can unlock electrical data from whole neighborhoods

Photo: Pattern Energy Group


UnderstandSolar is a free service that links you to top-rated solar installers in your region for personalized solar estimates. Tesla now offers price matching, so it’s important to shop for the best quotes. Click here to learn more and get your quotes. — *ad.

FTC: We use income earning auto affiliate links. More.

Stay up to date with the latest content by subscribing to Electrek on Google News. You’re reading Electrek— experts who break news about Tesla, electric vehicles, and green energy, day after day. Be sure to check out our homepage for all the latest news, and follow Electrek on Twitter, Facebook, and LinkedIn to stay in the loop. Don’t know where to start? Check out our YouTube channel for the latest reviews.

Comments

Author

Avatar for Michelle Lewis Michelle Lewis

Michelle Lewis is a writer and editor on Electrek and an editor on DroneDJ, 9to5Mac, and 9to5Google. She lives in White River Junction, Vermont. She has previously worked for Fast Company, the Guardian, News Deeply, Time, and others. Message Michelle on Twitter or at michelle@9to5mac.com. Check out her personal blog.


Manage push notifications

notification icon
We would like to show you notifications for the latest news and updates.
notification icon
You are subscribed to notifications
notification icon
We would like to show you notifications for the latest news and updates.
notification icon
You are subscribed to notifications