Skip to main content

Nevada’s Tesla Gigafactoy construction site work called ‘Biblical’ in scale

You don’t often trot out the word ‘Biblical’ when talking about a construction sites but a Reno developer saw fit:

“Building that pad in three and a half weeks was biblical,” Gilman said. “Work has not stopped. There’s still ongoing things, building catch basins, rerouting flood control, bank stabilization. But the pad is finished. It’s ready.”

FTC: We use income earning auto affiliate links. More.

Stay up to date with the latest content by subscribing to Electrek on Google News. You’re reading Electrek— experts who break news about Tesla, electric vehicles, and green energy, day after day. Be sure to check out our homepage for all the latest news, and follow Electrek on Twitter, Facebook, and LinkedIn to stay in the loop. Don’t know where to start? Check out our YouTube channel for the latest reviews.

Comments

  1. Rafi - 10 years ago

    Came across the site from 9to5mac.com article, Amazing and brilliant site, as Model S owner I was looking for this kind of site, perfect, keep up the great work and Thank you

Author

Avatar for Seth Weintraub Seth Weintraub

Publisher and Editorial Director of the 9to5/Electrek sites. Tesla Model 3, X and Chevy Bolt owner…5 ebikes and counting